Versions / Builds Affected
20131111Status
ResolvedProblem Summary
The Import Export Tool's 'Overall Progress' jumps to 100% and 'Finish' button is shown while still exportingTT / JIRAID
1906How to Identify
Processing (exporting) of the remaining mailboxes is still ongoing though.
This is merely a UI issue and should not have a negative impact on the export process itself. The downside is that the administrator thinks that the export job finished already although it did not yet complete.
Example flow:
1. There are 50 mailboxes in Exchange
2. You run the IET using the mode to export from "all mailboxes and folders"
3. You continue through the wizard and the export begins
4. At the point when the 1st mailbox is complete the "overall progress" bar jumps to 100% and the Cancel button changes to Finish
5. However, processing is still ongoing
There are no debug log entries which help to identify that a customer is facing this issue.Workaround / Fix Details
Fixed in MARC2014 build 20140616
-----
20131111
http://ftp.gfisoftware.com/patches/MARC2013/20131111/MARC2013_R2_PATCH_20140306_1906.zipRequired Actions
Upgrade to MARC2014 build 20140616 or newer